Sir Sam stopped the Chief Carpenter from filling the flooring of the ISD Office with 60 x 60 cm granite tiles until flush door wood would be changed to glass in so far as fully air-conditioning of the office is concerned. This flush door made of wood and its door jump would be used in the stock room constructed outside of the left side. District Staff, school heads and teachers strongly suggested for air-con instead of electric fans. Accordingly, electric fan does not also have sense in time of brownout. Sir Moore was fully convinced with the use of air-con but the flush door should be changed to glass so that people passing by outside still believe there are office workers inside though its door is close.
![]() |
Newly-renovated inner portion of ISD Office after concrete panel made a partition from Indanan North District Office
|


